DDA projections for Library Lot project

Recieved

March 4, 2010

Posted by

Ryan J. Stanton

Date posted

March 4, 2010

Attached are DDA projections for the library lot project. There also are two payment schedules for the bonds. The first is the one assuming the bonds were not sold as Build America Bonds. The second documents the savings from BAB's

Files